|
Awarding Agency
|
|
Agency Name and Address |
Yarmouth, Town of
Town Administrator
1146 Route 28
South Yarmouth, MA 02664 |
|
Project Number |
|
|
Estimated Cost |
$3,500,000 |
|
Contractor Qualification |
DCAMM Certificate |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
|
Contact Information |
|
Name |
Laurie Ruszala |
|
Phone |
508-771-7921 |
|
Fax |
|
|
Email Address |
lruszala@yarmouth.ma.us
Notify email address listed when final publish date assigned. |
|
Contract Information |
|
Project |
The scope of work includes the reconstruction of two equalization tanks at the Yarmouth STP. The tanks are buried and divided by a common center wall. Each tank has a volume of approximately 250,000 gallons. One tank shall remain in operation at all times. Scope includes the excavation above the tanks, removal of the roof slab, sandblasting of interior walls, construction of new concrete walls, columns and roof slab, removal and reinstallation internal tank equipment, backfill, surface restoration and applicable appurtenances. |
|
Plans/Specification Available |
at
https://www.yarmouth.ma.us/bids.aspx beginning 10/31/25 |
| General Bid Deadline
|
11/20/25 |
Time |
3:00 P.M. |
| Sub Bid Deadline
|
|
Time |
|
|
Sub Bid Category |
|
|
Additional Information |
Pre-bid conference: 11/12/25 @ 10:00 A.M. at Septage Treatment Plant, 47 Workshop Rd., South Yarmouth, MA. |
|
View the online copy of this publication.(hyperlink) |
|