|
Awarding Agency
|
|
Agency Name and Address |
Holliston, Town of
Select Board - Town Hall
703 Washington Street
Holliston, MA 01746 |
|
Project Number |
2025-01 |
|
Estimated Cost |
$450,000 |
|
Contractor Qualification |
Highway Division |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
|
Contact Information |
|
Name |
Robert Walker, Deputy Director of DPW |
|
Phone |
508-429-0621 |
|
Fax |
|
|
Email Address |
walkerr@holliston.k12.ma.us
Notify email address listed when final publish date assigned. |
|
Contract Information |
|
Project |
Culvert Replacement - Arch Street. The scope of Work includes, but is not limited to: traffic management plan, environmental protection measures, flow control and bypass pumping systems, dewatering, removal and disposal of the existing culvert, removal and replacement of the existing asbestos cement water main, coordination and related work associated with the gas main, furnishing and installing a new precast concrete three-sided (open bottom) box culvert, headwalls, precast concrete blocks wingwall and retaining walls, wood guardrail, paving, restorations of all disturbed areas, and all related Work. |
|
Plans/Specification Available |
only from www.biddocs.com where the Documents can be viewed electronically and downloaded at no cost or hard copies purchased beginning 12/17/25 @ 2:00 P.M. |
| General Bid Deadline
|
1/14/26 |
Time |
11:00 A.M |
| Sub Bid Deadline
|
|
Time |
|
|
Sub Bid Category |
|
|
Additional Information |
Questions regarding requests for Contract Documents to BidDocs Online, Inc. at www.biddocs.com, tel. 978-888-3350, or Nashoba Blue, Inc., tel. 978-568-1167. All technical questions shall be forwarded to AP Associates, Inc. at ali.parand@ap-associates.com and at tel. 508-376-2670. |
|
View the online copy of this publication.(hyperlink) |
|