Publications Subscription
|
|
Awarding Agency
|
Agency Name and Address |
Brockton, City of
45 School Street
Brockton, MA 02301 |
Project Number |
DPW-BID25-NEWBURY |
Estimated Cost |
$1,785,400.00 |
Contractor Qualification |
Highway Division |
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Jason Fliestra |
Phone |
617-452-6240 |
Fax |
|
Email Address |
flietstrajc@cdmsmith.com
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
Replacement of Newbury Street Bridge - The work includes the complete removal and replacement of the existing Newbury Street Bridge over Salisbury Brook. The work is inclusive of a bridge superstructure and substructure elements, existing stone masonry repointing, roadway pavement and sidewalk replacement, and all work required in the Contract Documents. |
Plans/Specification Available |
Bid Forms and Contract Documents are available online at www.Projectdog.com after 1:00 PM on April 24, 2025. Enter the Project Code #868291. |
General Bid Deadline
|
05/15/25 |
Time |
11:00 A.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
MassDOT prequalification of contractors with the class of work as, BRIDGE – CONSTRUCTION, for the project with an estimated value of $1,785,400.00 will be required.
This project is being Electronically Bid (E-Bid). Hard copy bids will not be accepted by the City of Brockton. Bidders and the public may view bid results, as well as
inspect bid documents via the Projectdog website or attend the in-person bid opening in the GAR Room, Second Floor, City Hall, 45 School Street, Brockton MA 02301.
|
View the online copy of this publication.(hyperlink) |
|
|