Publications Subscription
|
|
Awarding Agency
|
Agency Name and Address |
Bridgewater State University
131 Summer Street
Bridgewater, MA 02325 |
Project Number |
RFB-0003-2026 |
Estimated Cost |
$100,000 |
Contractor Qualification |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Maria D. Pacheco |
Phone |
508-531-2168 |
Fax |
|
Email Address |
m10pacheco@bridgew.edu
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
This project at Bridgewater State University Greenhouse involves replacing the existing Link4 environmental control system with a new, fully integrated, brand-agnostic system capable of automating temperature, humidity, ventilation, and lighting across multiple zones. The work includes safe removal and disposal of the current system, installation of new control components compatible with existing infrastructure, and coordination with licensed trades for system integration. The contractor will also be responsible for commissioning the system, ensuring full functionality, and providing comprehensive documentation and training for greenhouse staff. Deliverables include a fully operational system, a final commissioning report, and a training. |
Plans/Specification Available |
including Bid Forms and Documents, at www.biddocsonline.com beginning 7/16/25 @ 8:00 A.M. |
General Bid Deadline
|
7/30/25 |
Time |
2:00 P.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
Pre-Bid conference: 7/21/25 @ 10:00 A.M. See bid documents for more details. |
View the online copy of this publication.(hyperlink) |
|
|