Publications Subscription
|
|
Awarding Agency
|
Agency Name and Address |
Winchester, Town of
Department of Engineering
71 Mt. Vernon Street
Winchester, MA 01890 |
Project Number |
|
Estimated Cost |
$1,539,258 |
Contractor Qualification |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Genny Selfridge |
Phone |
978-532-1900 |
Fax |
|
Email Address |
selfridge.genny@wseinc.com
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
East Side CIP Project 1 Sanitary Sewer Rehabilitations. The scope of work of the Base Bid includes installation of approximately: 10 LF of open cut point repair of 6” gravity sanitary sewer at one location; 20 LF for 6-inch PVC building connections at one location; 10,452 LF of cured-in-place pipe (CIPP); grouting 121 service connections in cured-in-place pipe; exterior grouting and interior sealing of 390 VF of sewer manholes; grouting and patching 13 sewer manholes; installation of three manhole inflow dishes; building of seven manhole bench and inverts; replacement of one manhole frame and cover; 10,335 LF of post-construction flow isolation. Bid Alternates 1, 2, and 3 include additional quantities of similar work. |
Plans/Specification Available |
Accent Printing, 99 Chelmsford Road, North Billerica, MA 01862, 9:00 AM - 4:00 PM or online at www.accentblueprints.com |
General Bid Deadline
|
8/21/25 |
Time |
10:00 A.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
Contract documents may be viewed and downloaded free of charge. Copies may be obtained by completing an online order with payment of printing fee for each set.
|
View the online copy of this publication.(hyperlink) |
|
|