Awarding Agency
|
|
Agency Name and Address |
East Bridgewater, Town of
175 Central St.
East Bridgewater, MA 02333 |
|
Project Number |
CMR-001 |
|
Estimated Cost |
Construction Cost $100,928,707 |
|
Contractor Qualification |
DCAMM Certificate |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
|
Contact Information |
|
Name |
Matthew Gulino |
|
Phone |
774-573-8817 |
|
Fax |
|
|
Email Address |
mgulino@leftfieldpm.com
Notify email address listed when final publish date assigned. |
|
Contract Information |
|
Project |
The Central ES project is being completed in collaboration with the Massachusetts School Building Authority (MSBA). The proposed project is for the construction of a new 108,000 GSF elementary school. The location of the building will be on the same site and constructed on the two existing softball fields behind the existing school. Once the new building is complete and occupied, the existing school will be abated, demolished and graded so the softball fields can be replaced where the current school stands. These replacement fields will be synthetic turf. |
|
Plans/Specification Available |
The project has completed the Schematic Design (SD) phase. The projects MSBA SD submission will be made available with the RFQ. |
| General Bid Deadline
|
11/21/25 |
Time |
3:00 P.M. |
| Sub Bid Deadline
|
|
Time |
|
|
Sub Bid Category |
|
|
Additional Information |
This RFQ is for Construction Managers at Risk only. RFQ available by request to Owners Project Manager (OPM) at mgulino@leftfieldpm.com (use the subject "Request: Central Elementary School CMR RFQ"). A link to the RFQ documents will be provided. See the RFQ for submission guidelines. |
|
View the online copy of this publication.(hyperlink) |