Awarding Agency
|
|
Agency Name and Address |
Manchester-by-the-Sea, Town of
10 Central St, Town Hall Room 6
Manchester-by-the-Sea, MA 01944 |
|
Project Number |
|
|
Estimated Cost |
$11,000,000 |
|
Contractor Qualification |
DCAMM Certificate |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
|
Contact Information |
|
Name |
Stella Hindman |
|
Phone |
617-452-6348 |
|
Fax |
|
|
Email Address |
hindmansr@cdmsmith.com
Notify email address listed when final publish date assigned. |
|
Contract Information |
|
Project |
Furnishing all labor, equipment, materials, and incidentals required for construction of a 3,300 square foot (SF) building with two greensand filtration pressure vessels, two granular activated carbon (GAC) contract pressure vessels, two backwash storage tanks, backwash pumps, electrical room, mechanical room, bathroom and associated building support systems. The project also includes chemical feed modifications in the existing Chemical Building. The site will contain a subsurface equalization tank for washwater, natural gas generator, sewer ejector pump station, stormwater management system, and associated below-grade utilities. The project will include demolition of the existing Well Building and other miscellaneous equipment |
|
Plans/Specification Available |
|
| General Bid Deadline
|
2/12/26 |
Time |
11:00 A.M. |
| Sub Bid Deadline
|
2/12/26 |
Time |
11:00 A.M. |
|
Sub Bid Category |
Masonry; Miscellaneous and Ornamental Iron; Waterproofing, Dampproofing and Caulking; Roofing and Flashing; Painting; Plumbing; Heating, Ventilation & Air-Conditioning; Electrical |
|
Additional Information |
|
|
View the online copy of this publication.(hyperlink) |
|