Publications Subscription
|
|
Awarding Agency
|
Agency Name and Address |
Bolton, Town of
Department of Public Works
12 Forbush Mill Road,
Bolton, MA 01740 |
Project Number |
B5108-004 |
Estimated Cost |
$1,131,780 |
Contractor Qualification |
Highway Division |
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Sebastian Sak |
Phone |
781-375-2578 |
Fax |
|
Email Address |
ssak@tighebond.com
Do not notify email address listed when final publish date assigned. |
Contract Information |
Project |
Forbush Mill Road over Still River Proposed Bridge. The work consists of the demolition of two existing HDPE pipe culverts and headwalls and constructing a precast concrete rigid frame bridge on spread footings with precast retaining walls. The work also includes restoring the stream, banks, and wetlands, removal and replacement of the existing roadway surface and existing guardrails. |
Plans/Specification Available |
Wednesday, 4/9/25 at 5:00 P.M. from the Tighe & Bond website at: http://www.tighebond.com/Projects_Out_to_Bid.php |
General Bid Deadline
|
5/7/25 |
Time |
1:00 P.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
On-site Pre-bid conference: 4/15/25 @ 10:00 A.M. with a weather reschedule date of 4/16/25 at 10:00 A.M. MassDOT prequalification of contractors with the class of work as: Bridge - Culverts, for the project with an estimated value of $1,131,780 will be required. |
View the online copy of this publication.(hyperlink) |
|
|