Publications Subscription
|
|
Awarding Agency
|
Agency Name and Address |
Bridgewater State University
131 Summer Street
Bridgewater, MA 02324 |
Project Number |
RFQ No. 1 (FY24) |
Estimated Cost |
$48,000 |
Contractor Qualification |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Maria D. Pacheco |
Phone |
508-531-2168 |
Fax |
|
Email Address |
m10pacheco@bridgew.edu
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
Replacement of a reverse osmosis deionized (RODI) water system. The new system is to be a Complete water purification, storage, control and distribution system. Similar to the Centra R200 high flow HR with R660 upgrade, a high recovery RO kit, loop booster pump, as well as system installation. The system needs to be compatible with the size constraints of the unit that is currently on site and be able to connect to existing piping systems. |
Plans/Specification Available |
by contacting Robert Monteith, Project Manager, at 508-531-2450.
|
General Bid Deadline
|
3/6/24 |
Time |
10:00 A.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
For additional information regarding existing system contact Robert Monteith, Project Manager, at 508-531-2450. Upon award of contract, a 50% Payment Bond will be required for the general contractor. Prevailing rates of wages apply. |
View the online copy of this publication.(hyperlink) |
|
|