Publications Subscription
|
|
|
|
Awarding Agency
|
|
Agency Name and Address |
Concord, Town of
Public Works - Engineering Division
133 Keyes Road
Concord, MA 01742 |
|
Project Number |
25-3018 |
|
Estimated Cost |
$1,507,895.78 |
|
Contractor Qualification |
Highway Division |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
|
Contact Information |
|
Name |
Joseph Cormier |
|
Phone |
978-318-3210 |
|
Fax |
978-318-3245 |
|
Email Address |
jcormier@concordma.gov
Notify email address listed when final publish date assigned. |
|
Contract Information |
|
Project |
2025 Pavement Management Phase II. The proposed transportation improvement project includes reconstruction work, reclamation, and mill and overlays on several streets and a parking lot in the Town of Concord MA. The proposed work associated with the roadway reconstruction includes reclamation and mill and overlays, reconstruction of Americans with Disabilities Act (ADA)/Architectural Access Board (AAB) pedestrian curb ramps, HMA driveway apron reconstruction, earth excavation, pavement marking and crosswalk restriping, curbing, traffic sign installation, minor drainage improvements, sewer manholes casting adjustment and replacement, water gate boxes adjusting and other incidental work. |
|
Plans/Specification Available |
at www.Projectdog.com (enter Project Code 868759) or a free CD-ROM may be requested by contacting Projectdog, Inc. at tel. 978-499-9014 beginning 5/16/25 (shipping and handling charges apply). |
| General Bid Deadline
|
6/6/25 |
Time |
10:00 A.M. |
| Sub Bid Deadline
|
|
Time |
|
|
Sub Bid Category |
|
|
Additional Information |
Optional Pre-bid Meeting: 5/22/25 @ 9:00 A.M. at Concord Public Works, 133 Keyes Rd. followed by a site walk if necessary. |
|
View the online copy of this publication.(hyperlink) |
|
|