|
Awarding Agency
|
|
Agency Name and Address |
Lancaster, Town of
701 Main St.
Lancaster, MA 01523 |
|
Project Number |
VFD 01 |
|
Estimated Cost |
$35,000 |
|
Contractor Qualification |
|
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
|
Contact Information |
|
Name |
Scott MacDonald |
|
Phone |
978-365-2412 |
|
Fax |
|
|
Email Address |
smacdonald@lancasterma.gov
Notify email address listed when final publish date assigned. |
|
Contract Information |
|
Project |
Replacement and Installation of a New Franklin X-Drive VFD 460 Volt, 150 Amp, W/Disconnect Line Reactor, Output Filter with VHS 100 H.P. Motor, 3 Phase, 60 HZ, High Thrust, Premium Efficiency, Inverter Duty Rated, WP1 Enclosure, NEMA Design B W/Class H Insulation, NRR, ARGIS Shaft grounding Ring on DE Bearing Cap, (3) N/C Class F Thermostats and 115V Space Heater, at the Lancaster Water Department Well #2. |
|
Plans/Specification Available |
through Scott MacDonald at 392 Mill St. Ext., Lancaster MA 01523, smacdonald@lancasterma.gov, tel. 978-365-2412 x1101. |
| General Bid Deadline
|
12/29/25 |
Time |
10:00 A.M. |
| Sub Bid Deadline
|
|
Time |
|
|
Sub Bid Category |
|
|
Additional Information |
|
|
View the online copy of this publication.(hyperlink) |
|