Awarding Agency
|
Agency Name and Address |
Bondsville Fire and Water District
3174 Main Street, P.O. Box 179
Bondsville, MA 01009 |
Project Number |
07740.01 |
Estimated Cost |
$3,000,000 |
Contractor Qualification |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Donatien Djero |
Phone |
508-449-4350 |
Fax |
508-449-9400 |
Email Address |
ddjero@tataandhoward.com
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
The project consists of constructing and installing a 600,000-gallon capacity precast, prestressed, wire wound, concrete water storage tank off Jim Ash Road in Palmer, Massachusetts, with associated piping and appurtenances, a Tideflex mixing system, site clearing, paved access road, and other site work as required by the Contract Drawings and Specifications. |
Plans/Specification Available |
via ddjero@tataandhoward.com on 8/20/25 after 2:00 P.M. or by phone (508) 449-4350 between the hours of 8:00 A.M. and 4:00 P.M. |
General Bid Deadline
|
9/19/2025 |
Time |
1:00 P.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
Pre-bid conference: 9/4/25 @ 1:00 P.M. at the above agency address. This project is subject to the Build of America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, ยงยง 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States. |