Publications Subscription
|
|
|
|
Awarding Agency
|
|
Agency Name and Address |
Boston, City of
Planning & Development Agency
One City Hall, Ninth Floor
Boston, Massachusetts 02201 |
|
Project Number |
|
|
Estimated Cost |
|
|
Contractor Qualification |
DCAMM Certificate |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
|
Contact Information |
|
Name |
Robert Springer |
|
Phone |
617-918-5295 |
|
Fax |
|
|
Email Address |
robert.springer@boston.gov
Notify email address listed when final publish date assigned. |
|
Contract Information |
|
Project |
Olmsted Village Master Developer Massworks. Owner is Olmsted Village Master Developer LLC. The work includes storm water pollution prevention plan, site clearing and grubbing of proposed building and roadway sites and installation of drainage structures and systems, drainage pipes, catch basins, sewer structures, sewer connections, water main pipes, water main and fire protection services pipes, hydrants. The work also includes construction of West Main Street street lighting foundations, pull boxes and conduit. The work also includes construction of West Main Street full depth pavement to asphalt binder course and construction Warbler Way pervious pavement roadway surface to filter course with temporary asphalt pavement surface. The work also includes installation of telecommunication conduits and structures along West Main Street and Warbler Way and installation of Eversource conduit and structures along Warbler Way only. The Contractor shall submit a Storm Water Pollution Prevention |
|
Plans/Specification Available |
Bid documents will be available via a Nitsch FTP site. Email Frederick Berry at fberry@nitscheng.com after 11/24/25 @ 10:00 A.M. to receive the link. |
| General Bid Deadline
|
12/18/25 |
Time |
1:00 P.M. |
| Sub Bid Deadline
|
|
Time |
|
|
Sub Bid Category |
|
|
Additional Information |
|
|