Awarding Agency
|
Agency Name and Address |
Concord, Town of
Concord Public Works, Engineering Division
133 Keyes Road
Concord, MA 01742 |
Project Number |
26-3021 |
Estimated Cost |
$500,000.00 |
Contractor Qualification |
Highway Division |
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Justin Richardson |
Phone |
978-318-3210 |
Fax |
978-318-3245 |
Email Address |
jrichardson@concordma.gov
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
Baker Avenue Culvert Repair |
Plans/Specification Available |
at www.Projectdog.com on 7/31/25. Enter Project Code #869820 |
General Bid Deadline
|
8/21/25 |
Time |
10:00 A.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
The work under in this project includes repairing a triple pipe culvert under Baker Avenue. The existing culverts have failed at pipe joints under the southeastern sidewalk. The Town facilitated temporary repairs in 2024 to stabilize the area. The proposed work includes installation of a drainage vault to connect the failed sections of pipe together with associated restoration to the sidewalk and roadway. MassDOT prequalification is required of contractors with the class of work as (Bridge – Construction or Bridge-Culverts). |
View the online copy of this publication.(hyperlink) |