Publications Subscription
|
|
Awarding Agency
|
Agency Name and Address |
East Longmeadow, Town of
Department of Public Works
Town Hall
60 Center Square, 2nd Floor
East Longmeadow, MA 01028 |
Project Number |
E0714-085 |
Estimated Cost |
$65,000 |
Contractor Qualification |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Matthew Kirk |
Phone |
413-875-1319 |
Fax |
|
Email Address |
makirk@tighebond.com
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
Town of East Longmeadow, Sewershed E Wastewater Flow Monitoring Project: The work consists of installing a flow metering device over an existing 6-inch Parshall flume in an existing precast concrete vault, electrical/power conduits and wire, a SCADA control panel and antennae, and a utility pole. The work also includes replacing the vault access hatch. Although the work is for the Town of East Longmeadow the work is actually located at the east end of Oak Hollow Road in Springfield, Massachusetts. |
Plans/Specification Available |
at https://www.tighebond.com/projects-out-to-bid.php on 7/23/25 |
General Bid Deadline
|
8/20/25 |
Time |
11:00 A.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
|
View the online copy of this publication.(hyperlink) |
|
|