Awarding Agency
|
Agency Name and Address |
Greater New Bedford Regional Refuse Management District
300 Samuel Barnet Boulevard
New Bedford, MA 02745 |
Project Number |
|
Estimated Cost |
|
Contractor Qualification |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Katheryn Scott |
Phone |
508-819-1400 |
Fax |
|
Email Address |
KScott2@brwncald.com
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
Main Pump Station Rehabilitation Project
The work will consist of, but not limited to, the following: installation of temporary plugs in existing piping to isolate the existing main pump station wet well, and temporary bypass pump and piping; selective demolition of pumps, guide rails, support brackets, base elbows, associated hardware, and power and control wire to the existing pumps; surface preparation and recoating of the existing main pump station wet well interior; purchase and installation of submersible wastewater pumps, pump base elbows, guide rails, support brackets, lift chains, associated hardware, and instruments, control panel, power and control wiring for wastewater pumps; and, testing and startup of installed equipment. |
Plans/Specification Available |
Contract Documents may be examined and/or obtained by sending an electronic mail request to Katheryn Scott, EIT at KScott2@brwncald.com, on or after April 2, 2025. |
General Bid Deadline
|
05/16/25 |
Time |
9:00 A.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
A Pre-bid Conference will be held at 10:00 a.m., local time, on Thursday, April 10, 2025 at the Greater New Bedford Regional Refuse Management District office, 300 Samuel Barnet Boulevard, New Bedford, Massachusetts. |
View the online copy of this publication.(hyperlink) |
|