Publications Subscription
|
|
Awarding Agency
|
Agency Name and Address |
Hopkinton, Town of
School Committee
89 Hayden Rowe Street
Hopkinton MA 01748
|
Project Number |
MSBA ID 202001390010 |
Estimated Cost |
124 million |
Contractor Qualification |
DCAMM Certificate |
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Laureen Westman |
Phone |
617-477-7995 |
Fax |
|
Email Address |
OPMprocurement@vertexeng.com
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
Sealed bids for General and Subcontractors.
New 175,000 GSF, 1195 students Elementary School serving grades 2-4 and site development located at 147 Hayden Rowe Street. Substantial Completion is estimated for October 31, 2027.
|
Plans/Specification Available |
Bid Forms and Contract Documents shall be available online Monday, 3/25/2025 on/after noon at www.Projectdog.com Project Code 867282. For assistance, contact Projectdog Inc. at 978.499.9014.
|
General Bid Deadline
|
05/05/25 |
Time |
2:00 P.M. |
Sub Bid Deadline
|
04/21/25 |
Time |
2:00 P.M. |
Sub Bid Category |
Masonry, Misc. Metals, WD&C, Roofing & Flashing, Metal Windows, G&G, Tile, ACT, Resilient Flooring, Terrazzo, Painting, Elev, FP, Plumbing, HVAC, Elect |
Additional Information |
Only PREQUALIFIED BIDDERS can submit bids for this project in the following categories of work:
- General Contractor
- Subcontractor - Categories include: Masonry; Miscellaneous and Ornamental Iron; Waterproofing, Dampproofing, & Caulking; Roofing and Flashing; Metal Windows; Glass & Glazing; Tile; ACT; Resilient Floors; Terrazzo; Painting; Elevators; Fire Protection; Plumbing; Heating, Ventilation & Air Conditioning; Electrical
Contractors do NOT need to be pre-qualified to submit bids for this project in the following categories of work:
Elevators (open Bid)
Only prequalified Trade firms will be permitted to submit bids for the category of work in which they were prequalified. The Owner’s Project Manager is The Vertex Companies, LLC. and the Project Designer is Perkins Eastman. The estimated Construction time is 29.5 months.
Pre Bid Conference: A pre-bid conference will be held on 4/3/2025 at 4:00pm at Marathon School, 129 Hayden Rowe St, Hopkinto |
View the online copy of this publication.(hyperlink) |
|
|