|
Awarding Agency
|
|
Agency Name and Address |
North Sagamore Water District
14 Squanto Road
Sagamore Beach, MA 02562 |
|
Project Number |
2025-02 |
|
Estimated Cost |
$50,000 |
|
Contractor Qualification |
|
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
|
Contact Information |
|
Name |
Kristen Berger |
|
Phone |
508-726-2458 |
|
Fax |
|
|
Email Address |
kberger@resilientce.com
Notify email address listed when final publish date assigned. |
|
Contract Information |
|
Project |
Cleaning Beach Well and Church Lane Well. Work consists of removal, inspection and reinstallation of the well pump; inspecting and videoing the well; cleaning and redevelopment of the well; motor testing; and pump testing for the Beach Well and Church Lane Well. The Beach Well is a 52 feet deep, 24-inch diameter gravel packed well with 18-inch diameter liner screen and casing and design pumping rate of 500 gpm. The Church Lane Well is a 190 feet deep, 16-inch diameter gravel packed well with design pumping rate of 700 gpm. |
|
Plans/Specification Available |
from Resilient Civil Engineering, PC at admin@resilientce.com or 508-726-2458 beginning 9/3/25. |
| General Bid Deadline
|
9/17/25 |
Time |
2:00 P.M. |
| Sub Bid Deadline
|
|
Time |
|
|
Sub Bid Category |
|
|
Additional Information |
Electronic documents will be emailed at no cost. Hard copy available upon receipt of refundable $50 deposit and non-refundable $50 mailing fee, separate checks payable to Resilient Civil Engineering, PC. |
|
View the online copy of this publication.(hyperlink) |