Publications Subscription
|
|
Awarding Agency
|
Agency Name and Address |
Transportation, Department of (MassDOT)
Rail and Transit Division
10 Park Plaza, Room 3720, Suite A
Boston, MA 02116
|
Project Number |
614056-130141 - Ware River Cul |
Estimated Cost |
$1,320,000 |
Contractor Qualification |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Chalita Belfield, Director of Railroad Properties |
Phone |
|
Fax |
|
Email Address |
chalita.belfield@dot.state.ma.us
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
Ware River Secondary Culvert Replacements at MP 19.84 & MP 19.96. Removal, Disposal & Replacement of exist. twin 8” CMP culverts with 24” RCP culvert, and sheetpile wall at MP 19.84. Removal, Disposal & Replacement of exist. 36” x 36” stone box culvert with 48” RCP and wingwalls at MP 19.96. Work includes exist. track removal, storage, & reinstall; and design, install, maintenance, & removal of temp support of excavation, erosion control, and dewatering systems. |
Plans/Specification Available |
Bid docs available 6/11/2025 via COMMBUYS website (www.commbuys.com). Questions about this bid must be submitted through Q&A Tab in COMMBUYS. Respondents must sign in on COMMBUYS to post questions. |
General Bid Deadline
|
7/1/25 |
Time |
2:00 P.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
Mandatory pre-bid meeting & site tour: 6/18/2025 @ 10:00 a.m. E-mail William.j.lynch@jacobs.com for location and requirements to participate in site tour. Prospective bidders must be prequalified per MBTA “Procedures Governing Classification & Rating of Prospective Bidders.” No award will be given to a contractor not prequalified by MBTA in Cl. 1, General Transit Const., and/or Cl. 3, Trackwork, for a $1.32 million contract value at bid deadline and not at the pre-bid. Bidders must provide: 1. List of equipment that will be used 2. Completed Bid Bond 3. List of all work in last 3 years of similar size & scope demonstrating experience & qualifications 4. List of ongoing projects and 3 references from projects listed 5. Approved FRA drug & alcohol testing plan. Contractor experience working in and around an active rail line and ability to complete work in limited work window are required. |
View the online copy of this publication.(hyperlink) |
|
|