Awarding Agency
|
Agency Name and Address |
Newbury, Town of
12 Kent Way
Byfield, MA 01922 |
Project Number |
|
Estimated Cost |
|
Contractor Qualification |
|
Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.
|
Contact Information |
Name |
Jill Griffiths, PE |
Phone |
716-402-6777 |
Fax |
|
Email Address |
jgriffiths@gomezandsullivan.com
Notify email address listed when final publish date assigned. |
Contract Information |
Project |
The Larkin Dam Removal / Parker River Restoration Project includes: 1) removal of the approximately 38-foot-long, 5-foot-high concrete and stone Larkin Dam spillway and appurtenant structures (i.e., concrete abutments, retaining wall, fish ladder, and fish weirs), 2) dredging and installation of a 3-foot-thick rounded riprap scour countermeasure through the 38-foot-wide, 227-foot-long I-95 bridge located 1,000 feet upstream of the dam, and 3) removal of an 18-foot-wide, 2-foot-high, concrete low-head weir and stone abutment and installation of rounded riprap channel stabilization at the USGS gaging station located 180 feet upstream of the I-95 bridge. |
Plans/Specification Available |
Electronic bid documents may be obtained by contacting the Newbury Conservation Agent at conscom@newburyma.gov or the Engineer at the contact info above on or after June 4, 2025 at 10:00 am. |
General Bid Deadline
|
07/08/25 |
Time |
10:00 A.M. |
Sub Bid Deadline
|
|
Time |
|
Sub Bid Category |
|
Additional Information |
A pre-bid meeting will be held onsite on Wednesday, June 11th at 1:00 pm. Notice to Proceed is anticipated by July 21, 2025 (pending two state permits expected to be issued prior to that date). Substantial Completion, including completion of all instream work, is required by March 31, 2026. Final Completion is required by July 31, 2026. |
View the online copy of this publication.(hyperlink) |
|